We took a week's leave to move a little on the electrical part. In fact, it becomes urgent given our objectives. Our kitchen is to install the kitchen mid-May and as such, we have emphasized (a little late for that matter) with our tile for the floor to ask him to come on the ground floor before laying the kitchen ( This is normal!). So our tiler will come the week of April 23 to ask the tile part ground floor and clasped an interruption of construction until June to continue tiling of the bathroom (part less urgent because we have no imperative to that side). By April 23, we absolutely must make a first warming electric frames, this will be a little more work the screed before tiling. But to run the screens, we need an electrical panel that we still do not ask, or connect ... and secondarily a little more power than that delivered by our cabinet construction. Brief as work ahead! We decided to take another week to give a boost to our site.
Following is the program of festivities :
Following is the program of festivities :
- Connecting the control panel by EDF (Electronic Counter + circuit-breaker).
- Implementation of the last taken of the garage 230.
- Installation and connection of neon garage.
- Establishment TX302 PIC modules for interface with push buttons of the cellar.
- Installation of electrical panels.
- Commissioning frames hot for a first warm-up gently before the arrival of tile 23 April.
- Commissioning of the cellar lights (this requires programming group addresses via the ETS).