's it, we decided to toilets wall tile CDR! Finally, it is not too soon. Well, we'll see what it will give, we tried to do a little tuning, while remaining in lighter shades as tiling the floor. We stayed in the same make and type of tile that was used for the soil but the format is different (20x60 cm). We also took a plank and a column of tile "mosaic" will be implemented in the axis of the basin. And stuff, in imagined our little heads ... I fear the worst :-) We will see the result in some ... weeks.
Tuesday, May 29, 2007
Espresso Machine Under 200
But where did the health facility?
It does not move too much in the house, everyone has deserted! The tile is not there, the plasterer for fintions tablets window either! And because they're all waiting for the health and we! In fact, it has to intervene to last pose flows so that we can finish the installation of caissons, the plasterer can then intervene to finish and when everything is ready, the tile will follow. But after several phone calls, nothing to do, no news of health ... Stay tuned!
Wednesday, May 16, 2007
Free Gay Role Playing Game
The kitchen is laid!
Cuisines Schmidt came to ask the kitchen. It took two days and a half alone installer to mount it. We must now reflect on the form of the ceiling must incorporate electrical conduits and fixtures of the vent hood.
Friday, May 11, 2007
Victoria Secret Bras Fix
The timetable ... that's not it! Top
Before installation of the kitchen, we wanted to do the decor in this room, that is to say put wall coverings and paint. Given the lack of time, yeah, we can not all work in the same room, a tiler, a carpenter for installation of window sills and us for the decor, we had to skip it. It certainly complicate the task, since it will be more precise cuts in upholstery, and also more careful to avoid damaging the kitchen already asked, but we will do with, we have no choice!
Another small drawback, the refrigerator has not arrived after an order placed two months ago, it's hard! But maybe we will have a little luck, scheduled for delivery during the first day of installation of the kitchen. Fortunately it is an American fridge, so it's not a fundamentalist who would need the installation by the installer. This will be semi-recessed in a niche, the photos in the next few posts will be more explicit.
Another small drawback, the refrigerator has not arrived after an order placed two months ago, it's hard! But maybe we will have a little luck, scheduled for delivery during the first day of installation of the kitchen. Fortunately it is an American fridge, so it's not a fundamentalist who would need the installation by the installer. This will be semi-recessed in a niche, the photos in the next few posts will be more explicit.
Wednesday, May 9, 2007
How Long Does It Take For An Acess To Drain
tiling
The first step regarding the tiling is done. Since we took our tiler between two sites (yes, as it was decided rather late), it has been able to spend more than a week to pose, and so he went to the essentials. As the kitchen will be installed Monday, May 14, it was imperative that the tile is laid in this room! He began by laying the tiles in the living room to reach the kitchen. As a result, the DRC is partially complete, lacks much of the tiles of the entrance and it remains to put the toilet and office. The tiler will return in early June to finish the project, including the stairs and landing with the same floor tiles and the bathroom. Moreover, we decided to choose the tiles that will color cream and wenge. The wall tile toilet CDR is yet to be defined.
(View from the lounge, baseboards and joints to finish.)
(View of the kitchen being installed.)
Subscribe to:
Posts (Atom)