tiling

The first step regarding the tiling is done. Since we took our tiler between two sites (yes, as it was decided rather late), it has been able to spend more than a week to pose, and so he went to the essentials. As the kitchen will be installed Monday, May 14, it was imperative that the tile is laid in this room! He began by laying the tiles in the living room to reach the kitchen. As a result, the DRC is partially complete, lacks much of the tiles of the entrance and it remains to put the toilet and office. The tiler will return in early June to finish the project, including the stairs and landing with the same floor tiles and the bathroom. Moreover, we decided to choose the tiles that will color cream and wenge. The wall tile toilet CDR is yet to be defined.

(View from the lounge, baseboards and joints to finish.)

(View of the kitchen being installed.)