Given the situation, we appealed to our architect for a small site meeting to express our discontent. Indeed, being close to celebrate the 14 months after the first sod for landscaping, there is not much to do for us to intervene for decoration, and think perhaps a move in date! In short, our meeting was successful because the health intervened to connect the flow of the bath and shower so that the plasterer can close the boxes, they have also done something, and the finishing of window sills.
We now await the arrival of tile en-suite bathroom provided for next week. As for the tiled bathroom on the ground floor, it makes sense arrived in late June So now there is more to prevent our tiler so that it can continue its work.
0 comments:
Post a Comment