heating installation and wiring of electrical panels

's it, it attacks the tables. Part One, set up the modules on DIN rails and wire strips distributions phase / neutral (not easy on 25mm ²). Second step, power differentials in 16mm ². After, we must identify all son, pass through the password-son and then connect them to different modules.

The left column contains all the modules for the heating circuits and 230V outlets. The right column is for home automation modules. Breakers placed above the table on the right protect the circuits of light and flaps. For part

ISB, two power supplies 640mA have been implemented. Indeed, as we exceed the 64 modules, it was necessary to create another line using a second power supply and a line coupler. Thus, I chose to divide these functions into line "principal" and "secondary". The main functions include heating and lighting of the DRC and the floor and functions "side" orders include shutters, fixtures cellar and internet gateway. Thus, if a power outage, I just "vampirize" secondary line to run the hotline while waiting to change the material (Food) defective.

(Establishment of differential + wiring 25mm ²).

(View of the array distribution. A surge in the upper left has been established .)

(Establishment TEBIS modules on the right side of the table.)

(Here it is, the son went.)

(And that's it!)

(Placing hoods finish.)