Commissioning frames

After putting into operation the electrical panel, we Atel activate frames heaters. Indeed, we had two weeks to make a temperature rise and fall before the intervention of tile laid Monday, April 23. The task was not easy, given the temperatures we had in that period (> 22 ° C after twelve o'clock !!!). In short, we've done in office and the slab was still very heated. We cut the heat Saturday, April 21 as recommended in the DTU preoperatively Tiling (after performing a gradual fall in temperature).

(View from the lounge TX460)

All equipment is mounted in place on the ground floor and upstairs. To facilitate the design (sub-layers + wallcoverings), we will certainly do so after the fact ... Continued ...